Des infos sur ça et sur d'autres choses : http://romain.guigon.free.fr/Actualites.htm
Neues in Les Arcs/Peisey-Vallandry/La Plagne (Paradiski)
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
Oui...Terrible nouvelle

Des infos sur ça et sur d'autres choses : http://romain.guigon.free.fr/Actualites.htm
Des infos sur ça et sur d'autres choses : http://romain.guigon.free.fr/Actualites.htm
Immer auf www.PERSo-LAPLAGNE.fr
-
Emilius3557
- Shisha Pangma (8013m)
- Beiträge: 8158
- Registriert: 20.09.2002 - 11:26
- Skitage 25/26: 0
- Ski: nein
- Snowboard: nein
- Ort: Nürnberg
- Hat sich bedankt: 138 Mal
- Danksagung erhalten: 348 Mal
Merci Romain de nous informer directement! Je vais traduire les points les plus importants:
- die 8KSB Arpette von Leitner kostet 6,8 Mio. ¤. Ihr Bau ist noch nicht weit fortgeschritten. Die Stützen stehen, aber ohne Stützenköpfe, von den Stationen stehen nur die Betonfundamente. Die durchschnittliche Kapazität der Bahn soll bei etwa 4000 p/h liegen
- die 6KSB La Roche kommt für 2006/2007, die Rodungsarbeiten für die Trasse sind in vollem Gange. Die Bergstation wird am Standort der heutigen Bergstation der SLte Bouclets liegen, also direkte Verbindung nach Plagne Centre!
- für 2008 (heißt das 2007/2008?) ist der Ersatz der 4SB Verdons Sud durch eine 6KSB geplant
=> ich denke, dass es auch an der neuen Arpette-Bahn zu Stauungen kommen wird, zu den Spitzenzeiten
=> endlich eine KSB im Sektor Bouclets, zudem mit wirklich viel versprechender Trasse. Mal sehen, ob auch hinunter bis La Roche beschneit wird.
- die 8KSB Arpette von Leitner kostet 6,8 Mio. ¤. Ihr Bau ist noch nicht weit fortgeschritten. Die Stützen stehen, aber ohne Stützenköpfe, von den Stationen stehen nur die Betonfundamente. Die durchschnittliche Kapazität der Bahn soll bei etwa 4000 p/h liegen
- die 6KSB La Roche kommt für 2006/2007, die Rodungsarbeiten für die Trasse sind in vollem Gange. Die Bergstation wird am Standort der heutigen Bergstation der SLte Bouclets liegen, also direkte Verbindung nach Plagne Centre!
- für 2008 (heißt das 2007/2008?) ist der Ersatz der 4SB Verdons Sud durch eine 6KSB geplant
=> ich denke, dass es auch an der neuen Arpette-Bahn zu Stauungen kommen wird, zu den Spitzenzeiten
=> endlich eine KSB im Sektor Bouclets, zudem mit wirklich viel versprechender Trasse. Mal sehen, ob auch hinunter bis La Roche beschneit wird.
-
Emilius3557
- Shisha Pangma (8013m)
- Beiträge: 8158
- Registriert: 20.09.2002 - 11:26
- Skitage 25/26: 0
- Ski: nein
- Snowboard: nein
- Ort: Nürnberg
- Hat sich bedankt: 138 Mal
- Danksagung erhalten: 348 Mal
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
Voilà le tracé du TSD6 Des Bouclets (2006). Il partira de plus bas que les téléskis, mais arrivera au même endroit 
Immer auf www.PERSo-LAPLAGNE.fr
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
- k2k
- Moderator a.D.
- Beiträge: 7999
- Registriert: 03.10.2002 - 01:01
- Skitage 25/26: 0
- Ski: ja
- Snowboard: nein
- Hat sich bedankt: 72 Mal
- Danksagung erhalten: 18 Mal
Nur um mal kurz zu übersetzen, was RG uns einen Post weiter oben mitteilt: Es gibt eine Pressemitteilung von der SAP zum Thema Wiederaufbau der 6EUB Bellecôte. Ich habe diesen Schrieb eben auch per eMail bekommen und werde bei Gelegenheit mal das Wichtigste zusammenfassen.
Ich hab aber im Moment leider nicht mal die Zeit, es selbst durchzulesen. Deshalb: Wer des Französischen mächtig ist und/oder alle Details selber lesen will, der findet die Pressemitteilung im Anhang.
Ich hab aber im Moment leider nicht mal die Zeit, es selbst durchzulesen. Deshalb: Wer des Französischen mächtig ist und/oder alle Details selber lesen will, der findet die Pressemitteilung im Anhang.
- Dateianhänge
-
cdp_laplagne.pdf- (124.58 KiB) 59-mal heruntergeladen
"Seilbahnen sind komplexe technische Systeme. Sie sind Werke innovativen vielschichtigen Schaffens und bilden ein spannungsvolles Zusammenspiel technischer und wirtschaftlicher, politischer, sozio-kultureller und landschaftlicher Faktoren." (Schweizerisches Bundesamt für Kultur)
-
ajax-fan
- Großer Müggelberg (115m)
- Beiträge: 271
- Registriert: 06.05.2004 - 18:38
- Skitage 25/26: 0
- Ski: ja
- Snowboard: nein
- Hat sich bedankt: 0
- Danksagung erhalten: 2 Mal
Hier ein Bericht zum wiederaufbau
Quelle: www.ropeways.netLa Plagne: Reconstuction work after fire
After the fire on August 5th, reconstruction work on the station of the Bellecote cable car has started and will continue for four months. The aim: to re-open the connection between the ski fields and the glacier for December 2005.
Bernard Chancel, President and General Director for SAP, on the reconstruction of the arrival station G6 of the glacier cable car, “The challenge is considerable, but far from impossible”.
The Fire
Friday August 5th, 07:45am. A shepherd noticed smoke billowing from the arrival station of the Bellecote cable car a 3050m above sea level. Emergency services were alerted and all methods used in an attempt to try and put out the fire which had started. Teams were brought in by land and by helicopter, and with the help of two helicopters the fire was put out at 11:45am. The material damage was evaluated: station G6 was entirely destroyed, the cable melted under the heat of the fire, breaking and dragging down with it 5 cabins, one of which was broken in its fall. One pylon was destroyed, and two heads of pylons are to be replaced.
The Glacier and Traversee chairlifts, the high altitude restaurant and the emergency hut were untouched.
The same afternoon, representatives of corporations Pomagalski, BDRM (Departmental Office for Mechanical Lifts), research centre DSCA, and SAP, visited the site to assess and take immediate action with regards to reconstruction. It was decided that construction teams would work seven days a week, in shifts of 3 and 4 days, living on site in temporary accommodation set up at 3000m.
The reconstruction
The first task was to carve out a road to permit trucks and machines access to the site. This work was started without delay and lasted two weeks. From Wednesday August 24th, demolition teams were able to access the site. The new station will be built on the same site as the old one, necessitating the latter's total destruction. The remains will be evacuated by trucks bringing up the new materials.
The team, which will consist of up to 30 people, will live on site. An accommodation area, consisting of 8 bungalows, will be erected at the beginning of September. This area will consist of a kitchen bungalow, a refectory, toilets and showers, a dormitory and an office. As well as construction workers, a chef and a rescue worker will live at the site. The rescue worker will be in charge of first aid, stewardship, food stocks, kitchen help, de-icing, etc.
Stages of Construction
Following the demolition of the old station, the second phase of works will consist of the laying of concrete by the end of September. This phase must be completed before the onset of the first freezes expected by mid-October at this altitude. The concrete will be mixed at la Plagne brought up in stages to the glacier, using the 19km road which connects Plagne Villages to Glacier Bellecote.
The assembly of parts for the station will be made by lifting apparatus which will remain on site this winter and will be brought down again in the spring. Puma helicopters will complete any necessary lifting. The cable, which will be delivered by TrefilEurope in mid October, will be put in place from station G4 of the Roche de Mio, at 2700m above sea level. 6km in length (3 km each way), the cable will pass through station G5 at the Col de la Chiaupe at 2500m, to climb up in the direction of the Bellecote glacier, at 3050m. At G5, the preceding station, reconstruction needs are small – there is just one pylon, line and cable passage to repair. This work can be carried out parallel to that going on at the glacier.
The original cabins, which were being stored at the Roche de Mio station at the time of the fire, will be put back in place on the new line.
Reconstruction in Figures:
Between 3.5 and 4 million euros
6km of cable
19km of road from La Plagne village
1 hour ascent in a four-wheel drive
site at altitude of 3050m
altitude of Col de la Chiaupe: 2500m
Re-opening of lift predicted for December 2005
5 August 2005: date of fire
accommodation area for glacier: 8 bungalows
2500kg: maximum weight of materials to be carried by Puma helicopters
300,000: average number of passengers using this lift every winter
30: maximum number of workers living in the accommodation area at 3050m.
-
Emilius3557
- Shisha Pangma (8013m)
- Beiträge: 8158
- Registriert: 20.09.2002 - 11:26
- Skitage 25/26: 0
- Ski: nein
- Snowboard: nein
- Ort: Nürnberg
- Hat sich bedankt: 138 Mal
- Danksagung erhalten: 348 Mal
- k2k
- Moderator a.D.
- Beiträge: 7999
- Registriert: 03.10.2002 - 01:01
- Skitage 25/26: 0
- Ski: ja
- Snowboard: nein
- Hat sich bedankt: 72 Mal
- Danksagung erhalten: 18 Mal
Cool, die Pressemitteilung gabs also auch auf Englisch
"Seilbahnen sind komplexe technische Systeme. Sie sind Werke innovativen vielschichtigen Schaffens und bilden ein spannungsvolles Zusammenspiel technischer und wirtschaftlicher, politischer, sozio-kultureller und landschaftlicher Faktoren." (Schweizerisches Bundesamt für Kultur)
- k2k
- Moderator a.D.
- Beiträge: 7999
- Registriert: 03.10.2002 - 01:01
- Skitage 25/26: 0
- Ski: ja
- Snowboard: nein
- Hat sich bedankt: 72 Mal
- Danksagung erhalten: 18 Mal
Es gibt eine neue Pressemitteilung vom 20.10. zum Wiederaufbau der 6EUB: http://sdp.skiinfo.com/images/dppic/f71358.pdf?c=42
Kurz zusammengefasst:
- aufgrund der guten Wetterverhältnisse kommt man recht flott voran
- die Betonierungsarbeiten für die neue Bergstation sind abgeschlossen
- Förderseil und Umlenkscheibe wurden bereits geliefert
- für diese Woche ist die Lieferung der Stationstechnik sowie der Verkleidung der Bergstation vorgesehen (war vorher so ein Wellblech-Ding, schätze mal es wird wieder sowas)
- man gibt sich optimistisch und hofft auf weiterhin gute Verhältnisse
Kurz zusammengefasst:
- aufgrund der guten Wetterverhältnisse kommt man recht flott voran
- die Betonierungsarbeiten für die neue Bergstation sind abgeschlossen
- Förderseil und Umlenkscheibe wurden bereits geliefert
- für diese Woche ist die Lieferung der Stationstechnik sowie der Verkleidung der Bergstation vorgesehen (war vorher so ein Wellblech-Ding, schätze mal es wird wieder sowas)
- man gibt sich optimistisch und hofft auf weiterhin gute Verhältnisse
"Seilbahnen sind komplexe technische Systeme. Sie sind Werke innovativen vielschichtigen Schaffens und bilden ein spannungsvolles Zusammenspiel technischer und wirtschaftlicher, politischer, sozio-kultureller und landschaftlicher Faktoren." (Schweizerisches Bundesamt für Kultur)
-
Emilius3557
- Shisha Pangma (8013m)
- Beiträge: 8158
- Registriert: 20.09.2002 - 11:26
- Skitage 25/26: 0
- Ski: nein
- Snowboard: nein
- Ort: Nürnberg
- Hat sich bedankt: 138 Mal
- Danksagung erhalten: 348 Mal
http://romain.guigon.free.fr/Actualites.htm
Der Bau der 8KSB schreitet voran:


Zudem gibt es anscheinend in La Plagne eine höchst massive Umbennenungs-Aktion bei den Pistennamen und eine ähnlich tiefgreifende Umklassifizierung, um die z.T. hier schon bemängelte Inkonsequenz zu beheben (steiler Starthang + blauer Rest = rot).
Aber Details und Kommentare viel besser und detaillierter im Paradiski-Forum.
http://thermique74.nuxit.net/phpBB2/index.php
Der Bau der 8KSB schreitet voran:
Zudem gibt es anscheinend in La Plagne eine höchst massive Umbennenungs-Aktion bei den Pistennamen und eine ähnlich tiefgreifende Umklassifizierung, um die z.T. hier schon bemängelte Inkonsequenz zu beheben (steiler Starthang + blauer Rest = rot).
Aber Details und Kommentare viel besser und detaillierter im Paradiski-Forum.
http://thermique74.nuxit.net/phpBB2/index.php
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
Extract of Le Dauphiné Libéré (12/11/2005) about Bellecote Gondola reconstruction
Immer auf www.PERSo-LAPLAGNE.fr
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
News about Bellecôte Gondola :
http://romain.guigon.free.fr/Actualites.htm#24_11 => Press release with photos
http://romain.guigon.free.fr/Actualites.htm#27_11 => Last news with french TV report
In french...of course...
RG
http://romain.guigon.free.fr/Actualites.htm#24_11 => Press release with photos
http://romain.guigon.free.fr/Actualites.htm#27_11 => Last news with french TV report
In french...of course...
RG
Immer auf www.PERSo-LAPLAGNE.fr
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
Bellecôte Gondola has reopened !

> http://romain.guigon.free.fr/Actualites.htm#24_12
RG
> http://romain.guigon.free.fr/Actualites.htm#24_12
RG
Immer auf www.PERSo-LAPLAGNE.fr
-
RG - Plagnard
- Massada (5m)
- Beiträge: 52
- Registriert: 06.04.2004 - 17:11
- Skitage 25/26: 0
- Hat sich bedankt: 0
- Danksagung erhalten: 0
TSD8hurricane80 hat geschrieben:TSD6 Arpette
EDIT : Sorry. I see La Plagne everywhere
Zuletzt geändert von RG - Plagnard am 28.12.2005 - 13:09, insgesamt 3-mal geändert.
Immer auf www.PERSo-LAPLAGNE.fr